Floor Goes On
- Sprialelm
- Jun 9, 2017
- 1 min read
Before the floor goes on we cut a hole to access the spare and a hole for the black water tank. The bottom is covered with a thick roofing tar, heated to assist in getting it applied. We discovered the best tool to apply and spread the tar was gloved hands. After the tar a flashing tape was applied to the edges of the plywood to prevent in future water penetration. The tapes rated life is 30 years!




Comments